Back
Belgrade Waterfront – Metropolitan Hotel
October, 2021
Here is some great footage of the StrongForce Serbia team carrying out the Post Tension site works on the Belgrade Waterfront “Metropolitan Hotel Development.”
Working with Roberts, StrongForce provided “Design & Build” post tension solutions for the 32,500m2, 18 Level structure which included implementing the conversion of conventional reinforced areas to post tension, optimising the structure.
In doing so it ensured StrongForce played an instrumental role in delivering the super-structure ahead of programme, providing cost and time benefits to project stakeholders.